LATEST
Promise Kept! Cucurella Tattoos Luis de la Fuente After 2026 World Cup Franco Mastantuono shines at Real Madrid and surprises with a possible return to River Plate Colapinto Shines in Pirelli Testing in Hungary and Jokes Before F1 Break IFAB Admits Error: Why Breel Embolo's Red Card Against Argentina Was Wrong Curiosity's Heroic Wheels: How NASA Overcomes Wear After 14 Years on Mars Economy Relaunches Debt Tender: Seeks to Renew $8.5 Trillion and Debuts Key Dual Bond Argentina's Blue Dollar Hits Record $1,570 as Central Bank Breaks 135-Day Buying Streak Argentina's Central Bank Halts 135-Day Dollar Buying Streak: A Strategic Pause Shock in France: Remains of Five Babies Found in Home After Denial of Pregnancy Case Tragedy in Michigan: Father Kills Wife, Six Children, and Himself After Job Loss and Infidelity Accusations Promise Kept! Cucurella Tattoos Luis de la Fuente After 2026 World Cup Franco Mastantuono shines at Real Madrid and surprises with a possible return to River Plate Colapinto Shines in Pirelli Testing in Hungary and Jokes Before F1 Break IFAB Admits Error: Why Breel Embolo's Red Card Against Argentina Was Wrong Curiosity's Heroic Wheels: How NASA Overcomes Wear After 14 Years on Mars Economy Relaunches Debt Tender: Seeks to Renew $8.5 Trillion and Debuts Key Dual Bond Argentina's Blue Dollar Hits Record $1,570 as Central Bank Breaks 135-Day Buying Streak Argentina's Central Bank Halts 135-Day Dollar Buying Streak: A Strategic Pause Shock in France: Remains of Five Babies Found in Home After Denial of Pregnancy Case Tragedy in Michigan: Father Kills Wife, Six Children, and Himself After Job Loss and Infidelity Accusations
Español English 中文 Português Français Italiano Deutsch العربية Русский اردو

Historic Transfer: Santa Fe Takes Over Route A012 to Boost Argentine Exports

22/07/2026 16:06 - Actualidad

A Historic Milestone for Argentine Logistics

On July 22, 2026, in the Salón de los Acuerdos at the Casa Rosada (the seat of the Argentine national government), a landmark agreement was signed: for the first time in history, the national government has transferred the comprehensive administration of a national route to a province. The Governor of Santa Fe, Maximiliano Pullaro, and the national Chief of Cabinet, Diego Santilli, signed the agreement that cedes the A012 National Route to Santa Fe's jurisdiction for 20 years.

The ceremony was attended by the Secretary General of the Presidency, Karina Milei; National Deputy Gisela Scaglia; the Minister of Economy, Luis Caputo; as well as Santa Fe's Ministers Lisandro Enrico (Public Works) and Pablo Olivares (Economy).

Investment and Immediate Start

Construction work is scheduled to begin on Thursday, July 23 at 9:00 AM, at the intersection with National Route 34. The awarded company, Pose, has a deadline of six to seven months to execute the first stage, which will require an investment of 5 billion Argentine pesos.

The tasks will include deep and superficial pothole repair on the concrete, crack sealing, replacement of streetlights, painting, signage, and brush clearing. Simultaneously, two new roundabouts will be built at the intersections with Provincial Route 25 and the old National Route 9.

The Export Heart of the Country

The A012 is a 67-kilometer ring road that acts as the second beltway for Greater Rosario (Argentina's third-largest city and a major port hub). It connects national routes 9, 11, 33, and 34, preventing thousands of trucks from crossing urban areas to access the port complex.

Over 2 million trucks travel through this corridor every year, coming from 13 different provinces. According to Minister Olivares, 80% of Argentina's grain, flour, and oil exports leave through the ports of Santa Fe.

Restoration Plan Details

This transfer comes after months of complaints from the province regarding the deterioration and paralysis of national public works. Governor Pullaro's administration already had the bidding process ready, which was awarded in February 2026, prepared to be executed as soon as the agreement was signed.

  • Phase 1 (Months 1-4): Repair of concrete slabs, prioritizing the intersections with National Route 34 and National Route 9 (in Roldán), the most deteriorated sections.
  • Phase 2 (Months 5-7): Asphalt pothole repair on other stretches of the 67 km, with itinerant crews fixing potholes in parallel.
  • Complementary Works: Construction of a roundabout at the intersection with Provincial Route 25 (linked to the Camino de la Cremería) and a new roundabout at the old National Route 9.
Today's News
Alfredo's Column Alfredo S. Quiroga

Alfredo S. Quiroga